PE Pulverizer Machine Maintenance Measures

Time:2022-08-16

With the rapid development of technology now, PE pulverizer machine has slowly in the large-scale, intelligent change, relatively than the traditional PE mill, the new PE mill in the structure, or parameters have improved a lot, are like a good direction of change, so the development of new maintenance measures as well as maintenance methods, the following small part of the PE pulverizer machine for you to introduce in detail the relevant content.

PE Pulverizer Machine Maintenance Measures

First, PE pulverizer machine maintenance of the way

 

1, the main replacement of the applicable seasonal lubricants, fuel, take, increase the anti-freeze measures, etc. Arranged by the use of departmental organizations, operation shift leader inspection, and supervision.

 

2, After the end of the new pe pulverizer machine go together period, must be combined period maintenance, the main content is cleaning, tightening, adjustment and replacement of lubricating oil, by the use of the department to complete, asset manager inspection, asset management department supervision.

 

3, PE pulverizer machine, before transferring to the site, should be transferred for maintenance, the operation content can be maintained according to the technical condition of the mill, if necessary, anti-corrosion. The transfer maintenance shall be arranged and implemented by the mill transfer unit, inspected by the project department and asset manager, and supervised by the asset management department.

Second, PE pulverizer machine maintenance measures

 

1, PE pulverizer machine in the process of use, there should be fixed personnel responsible for the care, the operator must have a certain level of technology. PE pulverizer machine in the installation of the operator must be necessary technical training so that it understands the principle of PE pulverizer machine performance, familiar with the operating procedures.

 

2, after using the mill for a period of time, should be overhauled, while the grinding roller grinding ring shovel and other wearing parts for repair and replacement treatment, grinding roller device before and after the use of the connecting bolts and nuts should be carefully checked to see if there is a loose phenomenon, the lubricating grease is added enough.

 

3, in order to make the mill work normally, should develop equipment “equipment maintenance safety operation system” in order to ensure the long-term safe operation of PE pulverizer machine, at the same time have the necessary maintenance tools and grease and the corresponding accessories.

 

4, fineness adjustment, according to the size of the material, hard and soft, water content, specific gravity is different, the processing of coarse fineness is also different, can adjust the analyzer above, high speed, high fineness, low speed, low fineness. If the fineness is increased, the output will be reduced accordingly. If it still cannot meet the requirements, the fan speed should be debugged, and the user can master it flexibly.

 

5, grinding roller device use time more than 500 hours or so to replace the grinding roller, the roller set of rolling bearings must be cleaned, the damaged parts should be replaced in a timely manner, refueling tools available manual oil pump and grease gun.

 

6, The scrap limit of the grinding rollers and rings, the minimum remaining wall thickness shall not be less than 10mm.

 

7, When stopping, first stop feeding, the main machine still continues to QA, so that the residual grinding material continues to grind, after about one minute, the main machine motor and the analyzer motor can be closed to stop the grinding work, and then stop the fan motor in order to blow the residual powder.